martes, 12 de mayo de 2009



What developed in the electronics lab maca was very interesting because during the two weeks we were able to make the programming of a station and create a sequence of lights. Thanks to this work could enhance knowledge about what we had was a PLC. The first thing that gave us indications of how the sequence of lights that gave us a series of documents which had drawings of the stations and thus to begin the sequence of lights. At first we were a little difficult as we had to face a new simulator, but a little chat with an instructor is fixed this little mishap. This new simulator was the ability to schedule through ladder is a tool that we met when we worked with logixpro, but I had another way of programming which is called AWL is a little complicated at first because if one is not attentive to what being developed can be lost easily.